Tag: New Development (C.3.)
MRP Provision C.3 Compliance Webinar – April 1, 2026
AgendaDownload Stormwater Controls for Development ProjectsDownload Preparing Stormwater Control Plans – Regulatory Requirements and How to Avoid Common MistakesDownload
SCVURPPP Green Stormwater Infrastructure Handbook
SCVURPPP Green Stormwater Infrastructure Handbook Part 1 Part 2
Biotreatment Soil Media and Mulch Guidance
Biotreatment Soil Media (BSM) and Biotreatment Wood Mulch (BWM) are important elements of a bioretention system. The BSM specification was created by BASMAA (now known as BAMSC) and was last updated in 2016. Since that time, SCVURPPP and regional partners…
Annual C3 Workshop Low Impact Development and Green Stormwater Infrastructure: Design and Maintenance Tuesday – April 29, 2025
Workshop AgendaDownload Attendance ListDownload Review of Provision C.3 Requirements in MRP 3.0 - Jill Bicknell, SCVURPPPDownload GSI Handbook Updates and Details - Renee Crawford, SCVURPPPDownload Suspended Pavement Systems for Stormwater Treatment - Shawn Freedberg, DeepRoot Download Silva Cell Fact Sheet…
SCVURPPP Site Design Manual – Revised February 2007
SC_Site_Design_Manual_Final_0207 1Download
SCVURPPP List of Qualified Consultants – November 12, 2024
List of Qualified Consultants for Design, Review and/or Certification of Stormwater Treatment Best Management Practices and Hydromodification Flow Control Facilities Calichi Design Group (CDG) CSG Consultants, Inc. ENGEO Incorporated Geosyntec Ghirardelli Associates, Inc. Haley & Aldrich, Inc. Herrera Environmental Consultants,…
C.3 Stormwater Handbook (October 2024)
Chapters All Chapters (single PDF 9.0 MB) Cover Credits Table of Contents Glossary of Terms Chapter 1: Introduction and Guide to Using this Handbook Chapter 2: Background/Regulatory Requirements Chapter 3: Preparing Permit Application Submittals Chapter 4: Site Design Measures Chapter…
Provision C.3 Data Form 2024
SCVURPPP C.3 Data Form Fillable_2024_wpDownload
Sizing for Flow-Based Treatment Measures
Sizing for Flow-Based Treatment MeasuresDownload